ST 13 MAIN ST over ST 2
ST 2 MM 100.4 · County 027, Massachusetts · Built 1949 · 2 Lanes · 10,359 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.537511, -71.744017
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 77 years old.
Nearby Bridges
ST 13 MAIN ST over WATER N NASHUA RIVER
Built 1872
ST 2 over WATER N NASHUA RIVER
Built 1951
HWY HAMILTON ST over WATER N NASHUA RIVER
Built 1955
HWY HAMILTON ST over ST 2
Built 1949
HWY WHITNEY ST over WATER MONOOSNOC BROOK
Built 2015
ST 2 WB over HWY NASHUA ST
Built 1975
I 190 SB & ST2 EB over HWY NASHUA ST
Built 1975
HWY WATER ST over WATER MONOOSNOC BROOK
Built 1984
ST 12 N MAIN ST over ST 2
Built 1949
HWY MECHANIC ST over WATER MONOOSNOC BROOK
Built 1873
Bridge Details
- Structure #
- L080301LLDOTNBI
- Year Built
- 1949
- Length
- 29.3 m (96.1 ft)
- Max Span
- 13.1 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 10,359
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,078,000
- Total Project Cost
- $4,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.