ST 13 MAIN ST over ST 2

ST 2 MM 100.4 · County 027, Massachusetts · Built 1949 · 2 Lanes · 10,359 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L080301LLDOTNBI
Year Built
1949
Length
29.3 m (96.1 ft)
Max Span
13.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
10,359
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,078,000
Total Project Cost
$4,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.