HWY HAMILTON ST over WATER N NASHUA RIVER

.25 MI NW OF RTE 13 · County 027, Massachusetts · Built 1955 · 2 Lanes · 9,534 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L080011C9MUNNBI
Year Built
1955
Length
38 m (124.7 ft)
Max Span
23.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
9,534
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,044,000
Total Project Cost
$7,567,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.