ST 2 WB over HWY NASHUA ST

.5 MILES S.E. OF ST 13 · County 027, Massachusetts · Built 1975 · 3 Lanes · 32,888 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L080471NWDOTNBI
Year Built
1975
Length
44.2 m (145 ft)
Max Span
42.4 m
Width
27 m (88.6 ft)
Lanes
3
Daily Traffic
32,888
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,888,000
Total Project Cost
$11,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.