I 190 SB over HWY LEOMINSTER CONN
.5 MI. S. ST. 13 · County 027, Massachusetts · Built 1977 · 3 Lanes · 21,812 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.522239, -71.727069
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 49 years old.
Nearby Bridges
I 190 NB over HWY LEOMINSTER CONN
Built 1977
HWY LEOMSTR CONN over WATER N NASHUA RIVER
Built 1977
I 190 NB over ST 2 EB
Built 1975
I 190 NB OFF RAMP over ST 2 EB ON RAMP
Built 1977
ST 2 EB over HWY ST 2 WB OFF RAMP J
Built 1975
I 190 SB over HWY MECHANIC ST
Built 1977
HWY MECHANIC ST over WATER N NASHUA RIVER
Built 2010
I 190 NB over HWY MECHANIC ST
Built 1976
ST 2 WB over HWY ST 2 WB OFF RAMP J
Built 1975
I 190 RAMPS G & E over HWY MECHANIC ST
Built 1977
Bridge Details
- Structure #
- L080421W0DOTNBI
- Year Built
- 1977
- Length
- 39.9 m (130.9 ft)
- Max Span
- 38.7 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 3
- Daily Traffic
- 21,812
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,792,000
- Total Project Cost
- $5,689,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.