I 190 SB over HWY MECHANIC ST

MM 18.9 .2 M S OF ST2 · County 027, Massachusetts · Built 1977 · 3 Lanes · 24,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L080391VWDOTNBI
Year Built
1977
Length
23 m (75.5 ft)
Max Span
22 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
24,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,358,000
Total Project Cost
$3,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.