I 190 NB over HWY LEOMINSTER CONN

.1 MI N OF MECHANIC ST · County 027, Massachusetts · Built 1977 · 2 Lanes · 15,405 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
L080421VYDOTNBI
Year Built
1977
Length
45.7 m (149.9 ft)
Max Span
44.2 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
15,405
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$873,000
Total Project Cost
$1,310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.