I 190 NB over HWY MECHANIC ST

MM 18.9 .2 M S OF ST2 · County 027, Massachusetts · Built 1976 · 2 Lanes · 14,985 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L080391VXDOTNBI
Year Built
1976
Length
23.8 m (78.1 ft)
Max Span
22.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
14,985
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,135,000
Total Project Cost
$3,203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.