HWY HAMILTON ST over ST 2

.5 MILES WEST OF ST-13 · County 027, Massachusetts · Built 1949 · 2 Lanes · 9,744 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L0802820WDOTNBI
Year Built
1949
Reconstructed
2014
Length
63.4 m (208 ft)
Max Span
30.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,744
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,593,000
Total Project Cost
$3,890,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.