US 20 CAPE ST over I 90

1 MI W. OF BECKET RD A19 · County 003, Massachusetts · Built 1957 · 2 Lanes · 5,952 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L050524G8DOTNBI
Year Built
1957
Reconstructed
1994
Length
99.7 m (327.1 ft)
Max Span
29.6 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
5,952
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,907,000
Total Project Cost
$16,361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.