HWY CHESTNUT ST over WATER GREENWATER BROOK

500 N OF ROUTE 20 · County 003, Massachusetts · Built 1970 · 2 Lanes · 129 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L0503005JMUNNBI
Year Built
1970
Length
11.6 m (38.1 ft)
Max Span
11.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$804,000
Total Project Cost
$1,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.