US 20 CAPE ST over WATER GREENWATER BROOK

0.3 MI. E. OF MAPLE ST. · County 003, Massachusetts · Built 1939 · 2 Lanes · 4,745 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
L050240AXDOTNBI
Year Built
1939
Reconstructed
1992
Length
11.6 m (38.1 ft)
Max Span
10.7 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
4,745
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,325,000
Total Project Cost
$1,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.