I 90 WB over HWY CHESTNUT ST

.1 MI N. RTE 20 A18 · County 003, Massachusetts · Built 1957 · 2 Lanes · 12,181 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
L050514GBDOTNBI
Year Built
1957
Reconstructed
1993
Length
34.8 m (114.2 ft)
Max Span
11.3 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,181
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$623,000
Total Project Cost
$935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.