HWY CHESTNUT ST over WATER DAVIS BROOK

0.9MI FROM JCT W/ROUTE 20 · County 003, Massachusetts · Built 1939 · 1 Lanes · 129 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
L0503305LMUNNBI
Year Built
1939
Length
6.1 m (20 ft)
Max Span
6.1 m
Lanes
1
Daily Traffic
129
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$878,000
Total Project Cost
$1,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.