HWY HIGHLAND RD over ST140 SB

1.2 MI NE OF COUNTY ST · County 023, Massachusetts · Built 1969 · 2 Lanes · 6,725 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
L010143X7DOTNBI
Year Built
1969
Reconstructed
2005
Length
28.7 m (94.2 ft)
Max Span
27.7 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
6,725
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$543,000
Total Project Cost
$815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.