HWY PICKENS ST over ST140 NB

1.5 MI SE OF TAUNTON T.L. · County 023, Massachusetts · Built 1958 · 2 Lanes · 2,456 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
L010113YPDOTNBI
Year Built
1958
Length
19.2 m (63 ft)
Max Span
17.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,456
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,636,000
Total Project Cost
$2,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.