HWY HIGHLAND RD over ST140 NB

1.2 MI NE OF COUNTY ST · County 023, Massachusetts · Built 1958 · 2 Lanes · 6,725 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
L010103X6DOTNBI
Year Built
1958
Reconstructed
2005
Length
20.1 m (65.9 ft)
Max Span
19.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,725
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$393,000
Total Project Cost
$590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.