ST140 NB over HWY COUNTY ST

AT ST 140 · County 023, Massachusetts · Built 1958 · 2 Lanes · 15,388 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
L010093NRDOTNBI
Year Built
1958
Length
29.6 m (97.1 ft)
Max Span
28 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
15,388
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,019,000
Total Project Cost
$4,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.