ST140 over WATER FALL BROOK

1.0 MI S OF LAKEVIL T.L. · County 005, Massachusetts · Built 1957 · 5 Lanes · 42,857 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
F090183NNDOTNBI
Year Built
1957
Reconstructed
1968
Length
6.5 m (21.3 ft)
Max Span
3 m
Lanes
5
Daily Traffic
42,857
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$235,000
Total Project Cost
$353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.