HWY MALBONE ST over WATER CEDAR SWAMP RIVER
.5 MI SW OF PIERCE ST · County 023, Massachusetts · Built 1959 · 2 Lanes · 2,143 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.819897, -71.027169
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 67 years old.
Nearby Bridges
ST140 SB over ST 79 MYRICKS ST
Built 1970
ST140 NB over ST 79 MYRICKS ST
Built 1959
HWY FORGE RD over WATER ASSONET RIVER
Built 2012
HWY HOLLOWAY ST over ST140 SB
Built 1970
HWY HOLLOWAY ST over ST140 NB
Built 1959
HWY HOWLAND RD over RR MACRR
Built 1984
HWY BRYANT ST over ST 24
Built 1950
HWY LOCUST ST over WATER ASSONET RIVER
Built 1960
HWY PICKENS ST over ST140 SB
Built 1969
HWY PICKENS ST over ST140 NB
Built 1958
Bridge Details
- Structure #
- L0100844FMUNNBI
- Year Built
- 1959
- Length
- 13.7 m (44.9 ft)
- Max Span
- 4.3 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,143
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $953,000
- Total Project Cost
- $1,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.