HWY MALBONE ST over WATER CEDAR SWAMP RIVER

.5 MI SW OF PIERCE ST · County 023, Massachusetts · Built 1959 · 2 Lanes · 2,143 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L0100844FMUNNBI
Year Built
1959
Length
13.7 m (44.9 ft)
Max Span
4.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,143
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$953,000
Total Project Cost
$1,430,000