ST 80 over US 44

1.5 MI E OF PARTNG WY RD · County 023, Massachusetts · Built 2004 · 2 Lanes · 3,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
K01017AG8DOTNBI
Year Built
2004
Length
61.7 m (202.4 ft)
Max Span
30.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
3,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,416,000
Total Project Cost
$3,625,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.