US 44 over HWY BROOK ST

1.4 MI E OF ST 58 · County 023, Massachusetts · Built 2004 · 4 Lanes · 47,069 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C04020AG6DOTNBI
Year Built
2004
Length
36.5 m (119.8 ft)
Max Span
34.1 m
Width
26.9 m (88.3 ft)
Lanes
4
Daily Traffic
47,069
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$647,000
Total Project Cost
$971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.