US 44 HARDING ST over HWY CARMEL ST

1 MI NW OF CARVER TL · County 023, Massachusetts · Built 1968 · 2 Lanes · 29,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M1805745ADOTNBI
Year Built
1968
Length
23.8 m (78.1 ft)
Max Span
23.2 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
29,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,160,000
Total Project Cost
$1,741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.