US 44 HARDING ST over WATER NEMASKET RIVER

.5 M S OF RTE 44 / RR · County 023, Massachusetts · Built 1963 · 2 Lanes · 22,246 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
M1805545BDOTNBI
Year Built
1963
Length
11.6 m (38.1 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
22,246
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,055,000
Total Project Cost
$1,583,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.