ST 28 W GROVE ST over RR MBTA/CSX

TAUNTON TRACKS MP#34.894 · County 023, Massachusetts · Built 1850 · 4 Lanes · 17,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M180154BYDOT634
Year Built
1850
Reconstructed
1949
Length
30.2 m (99.1 ft)
Max Span
28.7 m
Width
18.1 m (59.4 ft)
Lanes
4
Daily Traffic
17,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,154,000
Total Project Cost
$6,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.