I 495 over WATER NEMASKET RIVER

1 M S OF RTE 495 / 105 · County 023, Massachusetts · Built 1958 · 4 Lanes · 44,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M18051462DOTNBI
Year Built
1958
Length
13.1 m (43 ft)
Max Span
11.9 m
Width
39 m (128 ft)
Lanes
4
Daily Traffic
44,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,545,000
Total Project Cost
$5,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.