HWY CENTER ST over RR MBTA/CSX
ADJACENT TO CAMBRIDGE ST. · County 023, Massachusetts · Built 1899 · 2 Lanes · 5,286 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.894358, -70.919639
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 127 years old.
Nearby Bridges
ST 28 W GROVE ST over RR MBTA/CSX
Built 1850
ST 28 W GROVE ST over RR MBTA/MACRR
Built 1850
I 495 over RR MBTA/CSX QNB 20.82
Built 1958
I 495 over COMB ST105 & MBTA/MACRR
Built 1958
HWY WAREHAM ST over WATER NEMASKET RIVER
Built 1964
US 44 HARDING ST over RR MBTA/CSX
Built 1963
HWY NEMASKET ST over WATER NEMASKET RIVER
Built 2004
US 44 HARDING ST over WATER NEMASKET RIVER
Built 1963
ST 28 E GROVE ST over WATER NEMASKET RIVER
Built 1930
ST105 E MAIN ST over WATER NEMASKET RIVER
Built 1926
Bridge Details
- Structure #
- M180144BXDOT634
- Year Built
- 1899
- Reconstructed
- 1997
- Length
- 19.2 m (63 ft)
- Max Span
- 16.2 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,286
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,153,000
- Total Project Cost
- $1,730,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.