ST 28 W GROVE ST over RR MBTA/MACRR
RAILROAD MP 34/894 · County 023, Massachusetts · Built 1850 · 4 Lanes · 17,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.887356, -70.920733
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 176 years old.
Nearby Bridges
ST 28 W GROVE ST over RR MBTA/CSX
Built 1850
I 495 over COMB ST105 & MBTA/MACRR
Built 1958
HWY CENTER ST over RR MBTA/CSX
Built 1899
I 495 over RR MBTA/CSX QNB 20.82
Built 1958
ST 28 E GROVE ST over WATER NEMASKET RIVER
Built 1930
I 495 over WATER NEMASKET RIVER
Built 1958
HWY WAREHAM ST over WATER NEMASKET RIVER
Built 1964
HWY WOOD ST over RR MBTA
Built 1850
HWY WOOD ST over I 495
Built 1958
HWY BRIDGE ST over WATER NEMASKET RIVER
Built 1968
Bridge Details
- Structure #
- M180164C0DOT634
- Year Built
- 1850
- Reconstructed
- 1949
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.6 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 4
- Daily Traffic
- 17,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,883,000
- Total Project Cost
- $2,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.