HWY FORGE HLL RD over WATER CHICKLEY RIVER

@ ROUTE 8A INTERSECTION · County 011, Massachusetts · Built 1939 · 1 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H130050HLMUNNBI
Year Built
1939
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,473,000
Total Project Cost
$3,710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.