ST 8 A/W HWLEY RD over WATER CHICKLEY RIVER

.2 MI S OF CHARLEMONT LIN · County 011, Massachusetts · Built 1939 · 2 Lanes · 650 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H130070F9MUNNBI
Year Built
1939
Reconstructed
2010
Length
35.6 m (116.8 ft)
Max Span
35.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
650
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,917,000
Total Project Cost
$2,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.