ST 2 over WATER DEERFIELD RIVER

AT ZOAR ROAD INTERSECTION · County 011, Massachusetts · Built 1955 · 2 Lanes · 2,305 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C050120JFDOTNBI
Year Built
1955
Reconstructed
2009
Length
138.8 m (455.4 ft)
Max Span
48.8 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
2,305
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,439,000
Total Project Cost
$21,659,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.