ST 8 A/W HWLEY RD over WATER DEERFIELD RIVER

AT JCT RTE 2 · County 011, Massachusetts · Built 1944 · 2 Lanes · 1,536 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C050100EQMUNNBI
Year Built
1944
Length
91.7 m (300.9 ft)
Max Span
22.9 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,536
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,018,000
Total Project Cost
$7,528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.