HWY MOUNTAIN RD over WATER MILL BROOK
50E OF RTE8A AT VINCENT · County 011, Massachusetts · Built 2004 · 2 Lanes · 120 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.643942, -72.866406
This bridge is in worse condition than 12.4% of bridges in County 011. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
ST 8 A/N HEATH RD over WATER MAXWELL BROOK
Built 1939
ST 8 A/N HEATH RD over WATER MILL BROOK
Built 1939
ST 8 A/N HEATH RD over WATER MILL BROOK
Built 1950
HWY MAXWELL RD over WATER MAXWELL BROOK
Built 2001
ST 2 over WATER MILL BROOK
Built 1938
HWY MOUNTAIN RD over WATER HARTWELL BROOK
Built 2012
ST 8 A/W HWLEY RD over WATER DEERFIELD RIVER
Built 1944
HWY S RIVER RD over WATER BOZRAH BROOK
Built 2005
HWY TOWER RD over WATER CHICKLEY RIVER
Built 2021
ST 8 A/JCKSNVL ST over WATER MILL BROOK
Built 2018
Bridge Details
- Structure #
- C05006AV2MUNNBI
- Year Built
- 2004
- Length
- 17.6 m (57.7 ft)
- Max Span
- 15.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,263,000
- Total Project Cost
- $1,895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.