ST 2 over RR PARR

0.5M W JCT TOWR RD 409.79 · County 011, Massachusetts · Built 1985 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C050240KWDOT634
Year Built
1985
Length
48.8 m (160.1 ft)
Max Span
17.7 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
2,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$506,000
Total Project Cost
$760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.