HWY SAVOY RD over WATER CHICKLEY RIVER

.7 MI WEST OF 8A · County 011, Massachusetts · Built 2016 · 2 Lanes · 129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
H13003BPGMUNNBI
Year Built
2016
Length
19.6 m (64.3 ft)
Max Span
18.3 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,803,000
Total Project Cost
$4,205,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.