ST 8 A/W HWLEY RD over WATER CHICKLEY RIVER

AT SAVOY RD INTERSECTION · County 011, Massachusetts · Built 1938 · 2 Lanes · 776 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
H130040F8MUNNBI
Year Built
1938
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
776
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,722,000
Total Project Cost
$4,084,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.