HWY SAVOY RD over WATER CHICKLEY RIVER

W OF RT8A 0.1M E OF SAVOY · County 011, Massachusetts · Built 1940 · 1 Lanes · 129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H130010HPMUNNBI
Year Built
1940
Length
33.2 m (108.9 ft)
Max Span
17.7 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
129
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$4,430,000
Total Project Cost
$6,646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.