I 90 EB over ST122 WORCESTER ST
AT I-90 MM 98.1 · County 027, Massachusetts · Built 1957 · 3 Lanes · 37,706 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.224947, -71.706017
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 WB over ST122 WORCESTER ST
Built 1957
I 90 over WATER QUINSIGAMOND RIVER
Built 1957
ST122 /ST140/WCSTR over WATER QUINSIGAMOND RIVER
Built 1905
ST140 N MAIN ST over WATER QUINSIGAMOND RIVER
Built 1850
I 90 EB over COMB SNOW RD & GURR
Built 1957
I 90 WB over COMB SNOW RD & GURR
Built 1957
HWY BRIGHAM HILL over I 90
Built 1957
ST140 SHREWSBRY ST over RR MBTA/CSX
Built 1936
I 90 WB over HWY DEERNOLM ST
Built 1957
I 90 EB over HWY DEERNOLM ST
Built 1957
Bridge Details
- Structure #
- G080304LDDOTNBI
- Year Built
- 1957
- Reconstructed
- 1986
- Length
- 37.3 m (122.4 ft)
- Max Span
- 18.1 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 3
- Daily Traffic
- 37,706
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,244,000
- Total Project Cost
- $6,367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.