I 90 EB over COMB SNOW RD & GURR

.3MI.E.WORCESTER ST K25 · County 027, Massachusetts · Built 1957 · 3 Lanes · 43,661 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
G080274LFDOTNBI
Year Built
1957
Reconstructed
1986
Length
49.1 m (161.1 ft)
Max Span
23.2 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
43,661
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,584,000
Total Project Cost
$8,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.