I 90 over WATER QUINSIGAMOND RIVER

I-90 MM 98.2 · County 027, Massachusetts · Built 1957 · 6 Lanes · 93,785 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
G080264LHDOTNBI
Year Built
1957
Length
11.9 m (39 ft)
Max Span
4.9 m
Width
75.9 m (249 ft)
Lanes
6
Daily Traffic
93,785
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$479,000
Total Project Cost
$719,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.