HWY BRIGHAM HILL over WATER QUINSIGAMOND RIVER

.2 M W OF RTE 140 · County 027, Massachusetts · Built 1888 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G080041BQMUNNBI
Year Built
1888
Reconstructed
1990
Length
12.8 m (42 ft)
Max Span
11.3 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$583,000
Total Project Cost
$875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.