ST122 /ST140/WCSTR over WATER QUINSIGAMOND RIVER

.4 MI. S.E. OF MASS-PIKE · County 027, Massachusetts · Built 1905 · 2 Lanes · 15,053 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G080021L6DOTNBI
Year Built
1905
Reconstructed
1988
Length
9.1 m (29.9 ft)
Max Span
7.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
15,053
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$695,000
Total Project Cost
$1,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.