I 90 WB over HWY DEERNOLM ST

MM 96.9 · County 027, Massachusetts · Built 1957 · 3 Lanes · 36,707 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
G080284LLDOTNBI
Year Built
1957
Reconstructed
1988
Length
20.1 m (65.9 ft)
Max Span
18.3 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
36,707
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$688,000
Total Project Cost
$1,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.