HWY BETTY SPRING over RR BMRR

.3 MILES WEST OF ST. 140 · County 027, Massachusetts · Built 1990 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G0100521UDOT634
Year Built
1990
Length
43.6 m (143 ft)
Max Span
16.6 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
2,400
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,514,000
Total Project Cost
$5,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.