ST 2 WB over ST140 W MAIN ST

RTE 2 MM 89.7 · County 027, Massachusetts · Built 2012 · 2 Lanes · 22,309 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W280215X2DOTNBI
Year Built
2012
Length
57 m (187 ft)
Max Span
28 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
22,309
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$626,000
Total Project Cost
$940,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.