ST 2 EB over ST140 W MAIN ST

89.7 MM ON ROUTE 2 · County 027, Massachusetts · Built 2013 · 3 Lanes · 18,681 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W280215X1DOTNBI
Year Built
2013
Length
57.4 m (188.3 ft)
Max Span
29.1 m
Width
17.5 m (57.4 ft)
Lanes
3
Daily Traffic
18,681
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,718,000
Total Project Cost
$2,578,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.