ST 2 EB over ST140 W MAIN ST
89.7 MM ON ROUTE 2 · County 027, Massachusetts · Built 2013 · 3 Lanes · 18,681 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.558475, -71.931431
This bridge is in worse condition than 11.5% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 13 years old.
Nearby Bridges
ST 2 WB over ST140 W MAIN ST
Built 2012
ST 2 WB over HWY BACON ST
Built 1965
ST 2 EB over HWY BACON ST
Built 1965
HWY BETTY SPRING over RR BMRR
Built 1990
ST140 over RR BMRR
Built 1980
ST 2 A/STATE RD E over ST 2
Built 1965
HWY BATTLES RD over WATER ROUND MEADOW BROOK
Built 2013
HWY WHITMNVIL RD over WATER WHITMAN RIVER
Built 1900
HWY WHITMNVIL RD over WATER WHITMAN RIVER
Built 2021
HWY OAKMONT AVE over WATER WHITMAN RIVER
Built 1968
Bridge Details
- Structure #
- W280215X1DOTNBI
- Year Built
- 2013
- Length
- 57.4 m (188.3 ft)
- Max Span
- 29.1 m
- Width
- 17.5 m (57.4 ft)
- Lanes
- 3
- Daily Traffic
- 18,681
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,718,000
- Total Project Cost
- $2,578,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.