I 95 SB/ST128 SB over HWY WINN ST
0.75 MI NE RT 95 & RT 3A · County 017, Massachusetts · Built 1949 · 4 Lanes · 99,185 vehicles/day
Overall
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.495933, -71.178211
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 77 years old.
Nearby Bridges
I 95 NB/ST128 NB over HWY WINN ST
Built 1949
I 95 SB/ST128 SB over ST 3 A/CAMBRIDGE ST
Built 1950
I 95 NB/ST128 NB over ST 3 A/CAMBRIDGE ST
Built 1950
I 95 NB/ST128 NB over ST 38 SB/MAIN ST
Built 1949
I 95 SB/ST128 SB over ST 38 SB/MAIN ST
Built 1949
I 95 NB/ST128 NB over ST 38 WB/MAIN ST
Built 1949
I 95 SB/ST128 SB over ST 38 WB/MAIN ST
Built 1949
I 95 SB/ST128 SB over HWY S BEDFORD ST
Built 1950
I 95 NB/ST128 NB over HWY S BEDFORD ST
Built 1950
I 95 SB/ST128 SB over HWY FOREST PARK RD
Built 1950
Bridge Details
- Structure #
- B290112EXDOTNBI
- Year Built
- 1949
- Reconstructed
- 1961
- Length
- 18.3 m (60 ft)
- Max Span
- 16.5 m
- Width
- 24.7 m (81 ft)
- Lanes
- 4
- Daily Traffic
- 99,185
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,047,000
- Total Project Cost
- $4,571,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.