I 95 NB/ST128 NB over HWY S BEDFORD ST
0.5 MI SW RT 95 & RT 3A · County 017, Massachusetts · Built 1950 · 4 Lanes · 92,706 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.485208, -71.196181
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 76 years old.
Nearby Bridges
I 95 SB/ST128 SB over HWY S BEDFORD ST
Built 1950
I 95 NB/ST128 NB over ST 3 A/CAMBRIDGE ST
Built 1950
I 95 SB/ST128 SB over ST 3 A/CAMBRIDGE ST
Built 1950
I 95 SB/ST128 SB over HWY MIDDLESEX TPK
Built 1962
I 95 NB/ST128 NB over HWY MIDDLESEX TPK
Built 1962
I 95 NB/ST128 NB over HWY WINN ST
Built 1949
I 95 SB/ST128 SB over HWY WINN ST
Built 1949
US 3 NB over I 95 /ST128 & CD
Built 1962
US 3 SB over I 95 /ST128 & CD
Built 1962
HWY TERR HALL AV over WATER VINE BROOK
Built 1956
Bridge Details
- Structure #
- B290092ERDOTNBI
- Year Built
- 1950
- Reconstructed
- 1962
- Length
- 40.5 m (132.9 ft)
- Max Span
- 15.8 m
- Width
- 20.9 m (68.6 ft)
- Lanes
- 4
- Daily Traffic
- 92,706
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,563,000
- Total Project Cost
- $8,345,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.