I 95 NB/ST128 NB over ST 3 A/CAMBRIDGE ST

AT JUNC. OF I 95 & ST 3A · County 017, Massachusetts · Built 1950 · 4 Lanes · 89,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B290102EUDOTNBI
Year Built
1950
Reconstructed
1964
Length
62.5 m (205.1 ft)
Max Span
32 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
89,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,244,000
Total Project Cost
$13,867,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.