I 95 SB/ST128 SB over ST 3 A/CAMBRIDGE ST

AT JUNC. OF I 95 & ST 3A · County 017, Massachusetts · Built 1950 · 4 Lanes · 93,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
B290102EVDOTNBI
Year Built
1950
Reconstructed
1964
Length
62.5 m (205.1 ft)
Max Span
32 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
93,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,682,000
Total Project Cost
$25,024,000