US 3 NB over I 95 /ST128 & CD

RT 3 AT RT 128 · County 017, Massachusetts · Built 1962 · 1 Lanes · 22,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B290062G3DOTNBI
Year Built
1962
Reconstructed
1993
Length
86.6 m (284.1 ft)
Max Span
21.9 m
Width
13.9 m (45.6 ft)
Lanes
1
Daily Traffic
22,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,851,000
Total Project Cost
$11,777,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.